It slips into the groove between adjoining slats and once it clicks into place you can hang items as heavy as 12 pounds.
How to secure vinyl siding.
For insulated siding the.
How to secure the last piece of vinyl siding step 1.
Secure the utility trim also called under sill trim just below the soffit using the same technique to secure.
Attach one end of the cable to the hook in the fish tape.
If rotten wood.
Each panel has a.
You don t have to cut into the siding to mount the block.
Using the chalkline as a guide install the top edge of the starter strip along the chalkline nailing at 10 254mm.
Most hooks are stainless steel so they won t corrode and they are easy to remove when you re done with them.
If the result is a whole number you re in.
Allow approximately 1 32 0 8mm clearance about the thickness of a dime between the fastener head and the siding panel.
How to retack siding.
But if the result is not a whole number you will need to cut the final piece of siding lengthwise in order to fill in.
Recruit a friend to hold the gap open in the bottom of the siding where you attach the cable to the tape.
Divide the length of each wall by 8 inches the width of a piece of siding.
Nail in the center of the starter strip nailing slots.
The block we show here has a built in electrical box so you don t need the one in the wall.
Be sure to leave about 1 8 of the nail exposed to allow the siding to flex during warmer or colder weather.
Remove the siding in the reverse of how it was installed.
Last reattach the vinyl siding.
However light fixtures must be secured to an electrical box.
Leave a minimum of 1 4 6 4mm clearance at all openings and stops.
Loosely secure it with galvanized roofing nails or.
Diy how to fix loose vinyl siding with a malco sideswiper siding tool.
If you have to cut the last row of siding you ll.
Step 6 pull the fish tape gently back in the direction where it was first inserted behind the vinyl siding while your helper feeds the cable behind the siding at the other end.
The easiest and safest way to hang something from vinyl siding is to use a siding hook.
When installing in temperatures below 40 degrees f increase minimum clearance to 3 8 9 5mm.
Vinyl siding is installed from the bottom up.
The mounting blocks are paintable and available in different sizes and profiles to fit most types of flat and lap vinyl siding styles.
Keep the ends of starter strips at least 1 4 6 4mm apart to allow for expansion fig.