You don t need to find a sweep that matches but it does need to be at least as long if not longer than the original sweep.
Installing shower door sweep.
Position the door.
In some cases.
Easy to install and adjust but doesn t always work well the staple on requires removing the door from the frame.
Carefully grasp the edge of the door sweep pulling it towards the outside of the door until the strip has come loose from the track.
If your door jamb is against a wall you may.
This type of door bottom is generally found on wood doors.
You will notice that the longer the sweep is the more expensive it is as well.
Steel and fiberglass doors normally use the slide on or snap in type.
Determine type of door bottom or door sweep.
Attach the seal strip to the bottom of the door and cut it to the required length.
Using the old shower door sweep as a guide head to the hardware store to buy a new shower door sweep.
Always follow the manufacturer s instruction for installation.
Take the old door sweep with you to your local.
Bring the old shower door sweep to a hardware or home supply.
Secure the door sweep in the drip rail by crimping the ends of the drip rail with a pair of pliers.
Mark and cut to fit.
Open the shower door from the outside.
Replace a shower door sweep.
Grab the edge of the sweep and pull it toward the outside of the door until the strip is removed from its track see a.
Cut off the ends of the sweep that extend past the edges of the drip rail with scissors or a.
The basic steps are simple.
Place end caps on the tops of the wall channels.
How to replace a shower door sweep.
Mark and cut to length if necessary the new door sweep.
Remove the old door stop and clean both the door and the glass or wall.
Attach the door handles and any towel bars.
Place the glass clamp sweep into place on the door s bottom edge and secure it at the door clamp.
Screws to the inside surface of the door.
Buy frameless shower door sweeps from dulles glass mirror.
The video covers installing a strip door sweep.
For both types measure your new door jamb from the curb of your shower to top of the shower door.