Pry under the edge of the remaining material starting on the downhill side using the roofing shingle shovel.
How to strip cold applied roofing.
Lay it out alongside the completed strip overlapping the second strip about 50mm 2 inch on top of the first strip.
Scrape underneath the material until you feel the nails stop the shovel.
Occupied buildings such as schools hospitals and offices may be reroofed with the use of low odor and ultra low voc cold adhesives.
Welcome welcome 4 welcome thank you for consulting the version 1 0 of the ruberoid sbs cold applied roofing systems manual.
Where the edge of the strip overlaps onto the first run nail through both sheets at 50mm 2 inch centres.
Starting at the middle centre and working towards the edge end.
Nail the second run of felt in the same manner as the first.
When you need the durability and exceptional waterproofing capability of a multi ply built up roof but using a system with hot materials is not the right choice tremco roofing s burmastic cold applied built up roof system is the way to go.
The term cold applied is referring to o.
All roof membrane components are in small enough packages that they may be transported by elevator.