Press into place remove the nails and peel off the paper on the other side.
How to staple paper to a roof.
Measure the size of your roof in square feet.
How to install roofing tar paper.
Snap chalklines on both sides for guides.
Begin your first row of tar paper with the bottom of the tar paper.
Roll out and smooth the wsu and drive a few nails on one side to hold it temporarily.
Check that it is level and aligned and drive staples or cap nails.
Tack it to roof using a hammer stapler or an electric staple gun.
Use a ladder to reach the bottom level of the roof.
Roll out the first section of tar paper over the ice and water shield.
The paper should then be nailed in or stapled every three to four inches across.
All nails and staples should be placed on the lower half of the paper.
Measure the width and height of each section separately.
Step 5 overlap the next strip of tar paper over the first one by 5 inches and staple in place.
No matter which valley method you use for extra protection apply wsu at a valley.
The idea is to make sure water that falls on the roof drips down from paper to paper and off the roof rather than up under the tar paper potentially damaging the roof s wooden structure.
The overhang to the next strip should be 3 8 inch.
Multiply the width by the height for the.
When you arrive at the rake the paper should be cut flush with a knife and then adjusted to line up with the chalk line.
Place a final piece of tar paper over the top of the roof attaching it so it overlaps the tar paper on both sides of the roof.