You can position them starting at the bottom or at the edges.
How to shingle the top of a hip roof.
Start nailing the shingles on the topmost corners.
Snap a vertical chalk line from the inside edge of the first shingle on the second row to the top of the roof and from the inside edge of the first shingle to the top of the roof.
These chalk lines will serve as a guide for subsequent even numbered rows of shingles and odd numbered rows respectively.
Use a chalk line to help you lay shingles in a straight row on the roof.
Fold the excess flap of roofing felt over the hip and staple the felt in place along the hip 4 to 5 inches from the edge of the hip.
The guys would cut a second shingle to overlap the back half of the first one.
Start on the end of the ridge opposite to the prevailing winds.
How to shingle a hip roof ridge will be done as follows.
The hip shingles continued all the way to the ridge and that last shingle was cut to length so as to avoid covering the open ridge rafter.
Three bundles of three tabbed shingles equal one square or 100 square.
That s how the guys.
Snap a couple of guide lines just a little inside the perimeter of the ridge so the lines get covered up when you re done.
Get some friends to help you shingle the hip roof.
Once all your shingles are installed you ll need to cover cap the ridge and hip ridges if you have a hip roof.
To make the shingle flush they would cut a short slice parallel with the ridge.
Align the first ridge cap piece with the end of the shingles and the chalk line.
Prepare the shingles on the surface of the roof.
After both hips were finished the guys would place a shingle along the ridge.
Start from the bottom edge of the ridge and secure each shingle with 1 1 2 inch nails.
Bending and overlapping these flaps the guys would put two more nails to anchor it in place.
The second step involves placing the first shingle on your roof.
Use the shears or utility knife to cut three tab shingles into three separate shingles to use as cap shingles for the hip roof.
Then finish by placing the last caps at the very top of the roof.
The top ridge cap shingles will overlap the hip ridge cap so start with the hips.
Use roofing cement to attach the leading edge of this ridge cap piece to the shingles below.
Trim the very last shingle on each ridge as needed.
Overlap them as before and continue until you reach the top.
Then trim the sides using a utility knife to match the angles.
Lay down several lines at once to save time.
If you want to keep your roof from getting potential water damage then you need to start your roofing project by adding flashing to the ridges and by adding strips of tin to the edges of your hip roof.